Friday, January 14, 2011

December 21st to January 14th

I finally recieved the new chemicals that I need to perform the controls. As I perform the control reaction included with the Generacer kit, I will also simultaneously perform the experimental reaction. To determine where the problem is occurring during the experiment, I will run tests on my sample following each step. This should allow me to pinpoint the source of error and from there I can devise a method to overcome any problems that are occurring. I have set everything up to begin this phase of the project next week and will update my status within 2 weeks.